werk, bauen+wohnen reports on Swiss and international architecture, with articles and digital issues.
Schweizerische Bauzeitung
espazium provides interdisciplinary coverage of architecture, engineering, planning and the built environment.

About Schweizerische Bauzeitung
Schweizerische Bauzeitung (TEC21) is part of espazium.ch, an online platform for building culture in Switzerland. It provides interdisciplinary coverage of architecture, engineering, planning and the built environment, including environment and interior design. Articles come from TEC21, TRACÉS, Archi and SIA, and the platform notes building culture coverage since 1874.
On the site you can read current reports, competition results and issue topics, such as Swiss residential high-rises over 60 m, projects in Malley-Lausanne, and the renovation of the Swiss cultural centre in Paris. There are also sections for industry news, jobs, architecture competitions, an education dossier, and event listings such as the Engadiner Architekturtage.
It suits readers interested in Swiss construction and design, including students, professionals and general readers following planning and environmental topics. The TEC21 section is in German, while sister editions cover French and Italian.
Key features
- News and reports on architecture and engineering
- Articles from TEC21, TRACÉS, Archi and SIA
- Coverage of architecture competitions and results
- Construction industry news and job listings
- German, French and Italian magazine editions
- Event listings and education topic dossier
- Interdisciplinary coverage of building topics
- Articles from multiple Swiss professional publications
- Includes competitions, jobs and event information
- TEC21 section content is in German
Schweizerische Bauzeitung at a glance
- Official website
- espazium.ch/tec21
- Category
- News & Media › Culture & Arts Magazines
- Type
- Publication
- Platforms
- Web
- Language
- German
- Country
- CH
- Last checked
- Oct 5, 2026 · Online when checked
- Listed
- Oct 5, 2026
Similar publications
Other listings in Culture & Arts Magazines with the most in common.
Schweizer Musikzeitung publishes a monthly Swiss newspaper on music, with news, reviews and features.
Brennstoff publishes articles on health, environment, society and current issues, with print and newsletter subscriptions.
ZEIT Wissen covers science and research, with reporting on health, environment and history.
Gazeta Południowa publishes Polish commentary and local reporting, including coverage of parks and community affairs.
Little Village publishes community and local news, with coverage of Iowa politics, culture, and regional affairs.
Popular in Culture & Arts Magazines
Well-known listings from the same topic.
Schweizerische Bauzeitung FAQ
What is espazium.ch?
What does the TEC21 section cover?
Does espazium list jobs and architecture competitions?
Tell us and an editor will check it.
Claim the listing and suggest updates yourself. An editor checks every claim first.












